With a length of approx. 400m and a draft of 9m, the Ethiopia Pier is one of the more important piers in Genoa.
Aim of monitoring:
The proposed monitoring system was designed to allow the control of the behavior of the dock during the excavation of the seabed and operation.
Main results:
MuST system integrated into a narrow service tunnel inside the pier structure
INSTALLATION PERIOD | TYPE OF SENSORS | NUMBER OF SENSORS |
2005 – 2007 | MuST | 8 |