• Companies
  • Contact
  • Search icon
Logo Smartec
    • Products
    • Applications
    • Services
    • Case Studies
    • Resources
    • About
      • About
      • News
      • Events
      • Contact
    • 0
Close icon Close icon Logo Smartec
  • Search icon
    • Products
    • Applications
    • Services
    • Case Studies
    • Resources
    • About
      • About
      • News
      • Events
      • Contact
    • 0
  • Companies
  • Contact
  • Logo linkedin
  • Logo youtube
Home » Case Studies » Cuyperstrap construction monitoring at Amsterdam Central Station, Netherlands

Cuyperstrap construction monitoring at Amsterdam Central Station, Netherlands

Published on November 28 2019
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

Commissioned by the municipality of Amsterdam, Max Bögl Nederland is building the Cuyperstrap in the monumental station building of Amsterdam Central, as part of ‘project De Entree’; Cuyperstrap will enable a dry transfer from train to metro station.

Image Cuyperstrap construction monitoring at Amsterdam Central Station, Netherlands

Fig.1 Impression of Cuyperstrap

The monitoring system consists of 2 inclinometer tubes to measure any deformations outside the construction pit. BouwRisk B.V. from Eindhoven has installed two PISA-M bi-axial in-place MEMS inclinometers from Smartec and Roctest.

The PISA-M in-place MEMS inclinometers combined with cellular modems enable remote and continuous monitoring of the lateral displacements of the soil. That way the construction process could be carried out without manual inclinometer measurements and with high precision of ±0.2 mm/m of lateral soil displacement at any time during the construction works.

Image

Fig.2 Data visualisation with monitoring software from Belgium company Vision42

Combing the PISA-M logger with monitoring software from Belgium data monitoring company Vision42, the end customer had total insight into the lateral soil displacement of the walls surrounding the construction site. Using the PISA-M in-place MEMS inclinometer with logger and cellular modem reduced the visits to the construction site to a limited number of times instead of performing numerous manual inclinometer measurements. Without the use of the PISA-M logger, it would not have been possible to achieve this fact. The added value of using the PISA-M logger can clearly be defined based on this project.

Image

Fig.3. In-Place-Inclinometers A and B - Measurements during construction works

Image

Fig.4 Inclinometer tube, In-Place-Inclinometer head and Logger enclosure

Image

Fig.5 In-Place-Inclinometer head

Related Applications

Other Applications 

Down arrow
close

Search Smartec

Searching...

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Legal
  • Privacy Notice
  • Terms and Conditions of Sale
  • Sitemap
Follow us
  • Logo linkedin
  • Logo youtube
Logo Logo