A portion of the concrete lining of the SAN SALVATORE tunnel collapse in June 2017 due to water accumulation. It was decided to install distributed fiber optic sensors onto the tunnel liner for a continuous and automatic monitoring of the tunnel.
A portion of the concrete lining of the SAN SALVATORE tunnel collapse in June 2017 due to water accumulation. It was decided to install distributed fiber optic sensors onto the tunnel liner for a continuous and automatic monitoring of the tunnel.
The Oleoducto de Crudos Pesados Oil Pipeline (OCP) with its 485km in length and total capacity of 190,000b/d of crude oil runs from the Oriente Region oil fields to the Balao Oil Terminal in Esmeraldas, Ecuador.
Smartec provided a turn-key service of Structural Health Monitoring SHM for three of the six dams on Jersey Island: Val de La Mare, Handois and Grand Vaux.
Luda Yana Dam and Water Treatment Plant are under construction near Panagyurishte town in Southern Bulgaria. The scope of this work is to provide water to the 45 000 people living in that region.
The Emosson Dam is situated in the Swiss Alps, near the French border, 1930 meters above sea level, near the Swiss town of Martigny. The aim of the project was to develop a new, long sensor.
With a length of approx. 400m and a draft of 9m, the Ethiopia pier is one of the more important pier in Genoa.